Residential Shingle Roofing Replacement, Edmonton, April 2014

This client contracted GRS to strip off their existing shingle roofing system, apply an ice and water membrane, then re-shingle the system on their home. GRS carried out the work and later returned to address a leak in another part of the roof. Continue reading Residential Shingle Roofing Replacement, Edmonton, April 2014

Edmonton Commercial Temporary Roof Repairs, August 2013

This condominium in Edmonton required temporary roof repairs to mitigate water and wind damage. Several areas of the rooftop had missing shingles and a full inspection of the building was requested by the client. Temporary repairs are needed to prevent further water damage inside the units. Inspection, August 12, 2013: This location has severe wind damage as out lined in an earlier correspondence with the client.
  • Specific to temporary repairs ordered, the area is approximately 10sq. of wind damage on 4 unit building (#64-#67).
  • Above unit 65 was hit worst.
  • Temporary repairs affected to 65 and others on block unit.
  • No visual hail damage on vents or any metal.
  • This is a 3 story back side and 2 story front side.
  • The pitch is approx 6/12 with some being 5/12.
  • The IKO brand shingle and product number A40490 color is weather wood.
    Further observation of complex:
  • Shingles missing and fascia and siding damaged to units 1 – 8, 24, 50, 80, 83 and 134.
  • While working on unit #65 I could see that there was wind damage to unit #83, unit #50, as well as unit #10 (photos taken). I added 4 shingles while up there to stop the water from entering.
  • Unit #50 & #10 I was unable to tend to them due to extreme weather conditions - they have similar areas as unit #65.
  • Unit #128 was missing a piece of facia.
  • Unit #138 was missing a a couple pieces of imitation cedar shake siding but there was no roof damage to this unit.
  • There is a serious mishap with the nail lines for this complex, every area that has blown off has the nails too high – installation of shingles will not meet manufacturer recommendation.
Additional Notes: The nails weren't long enough. The shingles discussed earlier were not nailed on the paint line. As well, the manufacturer has the seal line too high allowing wind to get under them to lift up and then blow off. What we need to do is take full measurements which will take quite an amount of time because some areas don't have access unless on a scaffold. I think it would take 2 days just for measurements. Measurements are better done from satellite. The following photos illustrate the shingle damage as well as part of the repair process: 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 < End Report > CODE: 2051 Contact Us Call our 24 hour emergency roofing repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Shingles Replacement and Plumbing/Ventilation Maintenance in Edmonton AB, July to August 2011

Below you will find a series of quotations and field reports from our Edmonton roofing repair crew. Our existing client approved our consultation for a full shingle replacement, system maintenance, and waterproofing. Quotation Request Received, July 28 2011: The client asked me to assess all five buildings in the condominium complex and give my recommendations for  each one. There are three 6-unit buildings and two 4-unit buildings. There is also a garage in the rear of the properties. I have attached the dimensions for each building.
Condo unit dimensions, plus garage
Dimensions for the condominium units and garage.
Note as well that there are 4' x 5' flat galvanized metal roofs above each entrance, but they do not require any attention at this time. Repair Assessment FIRST SET The units are past due for a re-roofing. The shingles on the bottom have not been functional for quite some time which has resulted in the roof deck rotting in some areas. The extent of the damage caused by the rot will not be known until we strip the shingles off. The flashing has also become loose, lifting up high enough away from the roofing that rain could easily blow in and damage the interior. I recommend a roof replacement as soon as possible.
100_1240
Condo side-view
100_1241
Condo front-view
100_1243
Weathered shingles
100_1242
Shingle assessment
100_1245
Flat portion assessment
100_1246
Cracked shingling
100_1244
Weathered shingles
  Materials required for low-slope application:
  • 41 shingles
  • 125 ft. cap
  • 314 ft. starter/drip
  • 18x 44 in. Ice & Water
  • 6x whirlybirds
  • 12x air vents
  • 6x 4 in. plumbing boots
  • 6x 6" x 4" plumbing pipe
SECOND SET This next unit is also due for a re-roofing, although it is not as urgent as the first. There is no evidence of rotting roof deck, but we will not know for sure until the roof is stripped. The flashing is also becoming loose, but not as bad as the first. I recommend it [the roof] be replaced this season. Materials required for low-slope application:
  • 28 shingles
  • 85 ft. cap
  • 234 ft. starter/drip
  • 13x 44 in. Ice & Water
  • 6x whirlybirds
  • 8x air vents
  • 4x 4 in. plumbing boots
  • 4x 6" x 4" plumbing pipe
100_1257
Past due on maintenance
100_1259
Cracking shingles
100_1260
More shingles requiring replacement
100_1261
Rear-view of another condo unit
100_1283
Condo side-view
100_1287
Front view
  THIRD SET This is a newer roof but it needs some attention. There are many shingles that need to be replaced to bring it back to a reasonable condition. There is also one chimney cap missing on this building. Materials:
  • 5x bundles BP 2-tone grey
  • 6x tubes Karnak
  • 1x 6 in. chimney cap
100_1265
Rear-view of condos
100_1267
Condo backyard
100_1269
Evident wear-and-tear
100_1275
Wear-and-tear by the gutters
100_1271
Odd shingle out
100_1278
Damage attributed to rotting wood
100_1280
Cracked roofing
  FOURTH SET Unit in relatively good shape with only a few shingles requiring replacement. Materials:
  • 1x bundle BP 2-tone grey
  • 2x tubes Karnak
100_1290
Torn shingles
100_1292
Needs replacing!
100_1293
Base view
  FIFTH SET The last building I assessed has had its roof replaced at some point but it is already showing signs of deterioration beyond repair. There is too much damage (especially on the bottom portion) to begin repairing it efficiently. One of the whirlybirds has lots several of its mounting screws and now the top portion of it is broken. I recommend that the entire roof be replaced in the near future. Materials required for low-slope application:
  • 41 shingles
  • 125 ft. cap
  • 314 ft. starter/drip
  • 18x 44 in. Ice & Water
  • 6x whirlybirds
  • 12x air vents
  • 6x 4 in. plumbing boots
  • 6x 6" x 4" plumbing pipe
100_1254
Damaged whirlybird
100_1247
In need of immediate maintenance
100_1248
Impeding water run-off
100_1250
Edge view
100_1249
Possible candidates for wood rot
100_1251
Torn shingles
100_1255
More torn shingles
Client Provided with Quotation, August 3 2011:
  • Remove shingles; dispose and apply new roofing
  • Types: architectural shingles, premium SBS modified shingles, premium slate/shake, metal/rubber/concrete
  • Venting correction
  • High profile shingle cap
  • Premium 44" Ice & Water protection: includes valleys, neck tie roof openings
  • Coloured flashings: drip edge, gable edge, valley, vents, walls
  • Complete roof underlayment wrap
  • Storm nailing and installation
  • Premium caulking: under vents, exposed nails, valleys, etc.
  • Replacement of rotted roof sheathing
Client approves the work on August 9 2011, crew begins on August 10 2011: The crew went around the roof and picked out all of the damaged shingles. There were a couple of pin-holed shingles as well. It was found that Ice & Water was used under the roof as underlayment. Everything that the crew removed was replaced. The same procedure was followed for the second complex. The shingles up for removal were sealed together very well, so when we applied more force, entire segments ripped off.
100_1423
Removing shingles in large segments
100_1242
Torn flashing and vent systems requiring maintenance
100_1243
Newer roofing system already experiencing weather damage
100_1244
Recommended a full replacement
100_1245
Top flat roof view
100_1417
More shingle removal
100_1426
Shingle removal from edges
  When the crew had finished ripping off the shingling on the west side of the sixth unit, we had to waterproof it. It was found that the roof was plank-based, rather than using sheeting. Rotten wood was also found that required replacement (an 8 ft. section). The remaining planks had their nails removed. Once preparation was complete, Ice & Water was applied to the base for waterproofing. The pallets for the east side were delivered later in the afternoon. Weather permitting, we will complete this site tomorrow.  
100_1444
Shingles fully removed
100_1446
This is what a bare roof looks like
100_1453
Cut-out for whirlybird
100_1452
Insulated roof
100_1454
Plumbing boot reinstalled
August 12, 2011: With respect to unit 6, we started ripping up shingles while concurrently working on plumbing stack penetrations. The penetrations were tarred and neck tied. Concurrently, re-shingled portions of the roof were waterproofed. There was no more rotten wood found. Our compressor stopped working near the end of cap placement. Hand nailing was our only option. Other than that, the day went as planned.
100_1458
Weatherproofing ventilation base
100_1461
Covering up punctures from the old shingle system
100_1459
Plumbing boot installation
100_1463
Weatherproofing the ventilation systems
100_1462   August 16, 2011: Remaining shingles on the east side were removed and no more rotten wood has been found on the units. Waterproofing continued and we began waste removal; the garbage bin had arrived in the morning. The crew is ready to begin roofing in the morning. August 17, 2011: West side shingles were removed today, but we got rained out while trying to take off the flashing from the sidings. Installation of replacement shingles began.
100_1464
Installing new shingles
100_1465
Old shingles undergoing removal
100_1466 August 18, 2011 One of the plumbing stacks came too far out from the roof for the plumbing boot to fit. A crewman was sent back to the shop to get two high dome boots, so we kept putting the PVC pipes in. Two whirlybirds were also cut in and installed. We will complete this site tomorrow around the afternoon.
100_1471
Plumbing boot installation
100_1470
We had to re-size some segments
100_1467
Preparing to install ventilation system
100_1468
Installed
  Site Completition, August 19 2011: Last two whirlybirds installed and all penetrations completed. As predicted, job site was completed around the afternoon after cleanup and remaining shingles were installed.
100_1495
Wind turbine preparation work
100_1497
New wind turbines installed
100_1498
Completed roof
100_1492
One side finished
100_1493
Closeup of a wind turbine reinstallation
100_1494   < End Report > Code: 133 Contact Us Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.