EPDM Membrane Flat Roof Commercial Re-Roof Edmonton June 10, 2015

ARTICLE: EPDM Membrane Re-Roof of Commercial Building Flat Roof Edmonton Alberta June 10, 2015.

The following roof report is of a GRS crew completing a full re-roof on a commercial building in Edmonton Alberta. This roof was 8600 sq. ft in size.  This consists of moving gravel from sections of roof.  Installing a new EPDM membrane to the surface of the roof.  Then covering the new EPDM membrane back up with the gravel. CREW ARRIVES FOR DAY ONE OF THE JOB. 10:00 am arrive on site. Filled out our hazard assessment form, then went up on the roof. We loaded our accessories on the roof with a rope, the main roofing materials were lifted with crane. Once it was all loaded, we started to move gravel on the right side of the roof. My original plan was to remove gravel in a 20' x 50' ft. areas on the roof. I changed my plan and just removed all the gravel from one side of the roof. That way we could just roof all weekend, rather then push gravel again tomorrow.  We managed to get all the gravel from one side of the roof to the other. Now have a nice chunk to roof in over the weekend. 5:00 pm leave site. DAY ONE PHOTOS.
Gravel we had shovel
Roof ballast rock we had to shovel to get at roof deck.
shoveld Section oF Roof.
Cleared section of roof.
Another shoveled off section of roof.
Another cleaned off section of roof.
  CREW ARRIVES FOR DAY TWO OF JOB. 7:00 am arrive on site. Had our daily tool box meeting. We then got up on the roof and started to cut the old EPDM membrane out. We Then laid down the new EPDM membrane. The way the lay-out worked was we had to put separate pieces up the parapet walls on the north side. If I didn't do it this way I would of ran into trouble with all the pitch pockets. We manged to put 2000 sq. ft. in today.  Most of the units we had in that area are all sealed in and form flashed on the corners. We did this with four guys. Tomorrow should go better with six. 6:30 pm leave site. DAY TWO PHOTOS.
Corner patches and EPDM seam complete .
Corner patches and EPDM seam all finished.
Large section of EPDM Membrane Finished. with finished Parapet walls in background.
Large section of EPDM membrane installed, with parapet walls in background.
Finished product of EPDM Membrane Flat Roof.
Finished section of EPDM membrane flat roof.
corner patches on a roof top unit.
Close up of corner patches on a roof top unit.
  WEDNESDAY JUNE 10, 2015 CREW ARRIVES FOR DAY THREE OF JOB.

7:30 am arrive on site. Had our daily tool box meeting. Today we had a crew of six guys working on the roof. So all six of us then got up on the roof. I had two guys start doing detail work while I had two other guys start putting in pieces of EPDM membrane under the rooftop make-up air duct work. This wasn't easy because we could only do 15 feet at a time. The reason for this was we had to jack up the air duct and remove the rooftop pavers. We then had to put them back in once we got the piece lined up my work partner and I were laying the field - which is a lot of measuring and cutting to get the pieces to fit in around all the units. I had a half day on the north side of the roof which is the difficult side of the roof due to all the units and penetrations. We then will move to the south side, which will be easier side because there is very little detail work on that side of the roof. The EPDM membrane re-roof  is 50% complete as of day three.

6:30 pm leave site.

DAY THREE PHOTOS.

Detail work, more corner patches .
Detail work, corner patches on a rooftop unit curb.
EPDM Membrane laid out and finished under the air unit duct work.
EPDM membrane laid out under the air unit duct work.
 EPDM Membrane work around air duct unit.
Close up of EPDM work around air duct unit.
 Laid out EPDM Membrane on the field of roof.
EPDM membrane we laid out in the field of roof.
Laying out EPDM Membrane on the field of the roof.
Starting to lay out EPDM membrane on the field of the roof.
  THURSDAY JUNE 11, 2015 CREW ARRIVES FOR DAY FOUR OF JOB. Today we had to finish the north section of the roof. We had to install the two last pieces of EPDM and roof in around three units. While myself and two others were doing that I had two other guys start gluing up the walls. At 2 o'clock there was a serious threat of rain so it was all hands on deck to get the exposed long lap sealed in around all the posts. We also had gum cups to do, which we managed to get done in just  the nick of time. DAY FOUR PHOTOS.
Installing last two pieces of EPDM.
Installing last two pieces of EPDM.
Finished EPDM Flat Roof(without gravel)
Finished EPDM flat roof (without rock ballast).
Finished EPDM Flat Roof with walls all glued in.
Finished EPDM flat roof with walls all glued in.
  FRIDAY JUNE 12 CREW ARRIVES FOR DAY FIVE OF JOB.

When we arrived first thing in the morning we had to clean up some water from the rain the night before. After that I started on lap sealant where it was required and did a search of all the laps and corners to make sure they were all tight before we put all the rock back on that side of the roof. Once inspection was done we then put all the pavers back where they were before we took them out, we then filled in with gravel. Once the gravel was back in place we then turned our focus to the south side of the roof. We removed  80% of the gravel so we can start to lay EPDM down in the morning. This shouldn't take that long once the new membrane is down. I will get guys on gravel right away while others glue up the walls and start detail work.

DAY FIVE PHOTOS.

Gravel laid back in, with pavers re-insatlled.
Gravel laid back in, with pavers re-installed.
Installing pavers, before we started to lay gravel back down.
Installing pavers, before we started to lay gravel back down.
South side of roof, after we cleared off gravel.
South side of roof, after we cleared off gravel.
 

Monday June 15th: Crew Arrives For Day Six Of Job.

Today we we cleared off the gravel on the s.w corner of the roof. The area was 20 x 110 feet. Once that was done,  we swept the area off  and laid out our first run of EPDM 10 x 100 ft. Once that piece was all installed I had one worker start the next run of EPDM 10 x 100 ft so he could start on the seams.  I then had another worker start on the walls while I was doing the details around the drain and post. At the end we started to put the gravel back on that section of the roof so we could start the next section the next morning.

Day Six Photos.

Moving gravel from SW corner of building.
Moving gravel from SW corner of building.
Detail work around posts
Detail work around posts.
Detail work around rooftop drain.
Detail work around rooftop drain.
  Tuesday June 16, 2015: Crew Arrives For Day Seven On Job. Today we started by moving the rest of the gravel off the SE portion of the roof so we could then lay down the last two pieces of the EPDM membrane. Once all the gravel was moved we laid in the 2 pieces of EPDM 70 ft by 10 ft. Once they were in we installed our seam tape and started our laps on the EPDM. Once the final pieces of EPDM were installed and complete I had a worker finishing the walls and I was finishing all the detail work. At the end of the day we put all the perimeter metal back on and spread all the gravel out. We then packed up all of our stuff and down loaded it off the roof to the truck and trailer. This job is now complete. Day 7 Photos.
Seams all finished On EPDM Membrane
Seams all finished on EPDM membrane.
Finished section of roof.
Finished section of roof.
Finished section of flat roof, with gravel all back on.
Finished section of flat roof, with gravel all back on.
Parapet walls on complete EPDM Roof.
Parapet walls on complete EPDM Roof.
  Contact Us.
Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5.
For all other areas of Canada call 1.877.497.3528 Toll Free.
We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.
CODE: 9110.

Roof Coating Edmonton. Metal Roof. June 15, 2015.

Article: Industrial Liquid Rubber Metal Roof Coating Edmonton, Alberta.

The roof report below outlines the application scope of work for a liquid rubber roof coating to an industrial standing seam metal roof in Edmonton, Alberta. Roof Coating Edmonton. Roof coatings have been around almost as long as metal roofing has. At issue however, especially in Canada, is finding a roof coating that actually performs to its suitable use and purpose. The purpose of a roof coating is to extend the life of your metal roof and to provide leak free service during that extension of time.
If the coating doesn't provide leak free service and does not therefore extend the life-cycle of your metal roof your money is then lost.
There are two primary reasons roof coatings (specifically in Canada) typically do not fulfill expectations. The first reason is that many of the coatings that are used in Canada are not designed for the harsh weather we have in Canada - specifically the cold temperatures, brutal damage caused by ice dams and the weight of snow loads. The other reason is that the coating itself is just part of the job. In other words, the whole scope of work is what makes a roof coating work properly.
Applying the coating is just a small part of a successful roof coating.
To understand the full scope of work required in Canada for a roof coating to be successful, visit this link to our local Edmonton Roof Repair website and watch the metal roof coating video. It explains in detail what is required for a roof coating in Canada to work. Our roof coatings extend the country from the west coast to eastern Canada and everywhere between. We now coat millions of square feet of liquid rubber in Canada and our crews have become leaders in the industry as a result. I can confidently state the we are one of, if not the largest roof coating companies in Canada. Our clients include everyone from farm owners, acreages, mills, large commercial operations to industrial complexes to oil and gas sites. We have coatings on buildings at mines in the mountains, mills, on tanks, in ponds, on roofs, on foundations, industrial gutters, waterproofing walls and almost everywhere you could image waterproofing to be required. Below is a report from Edmonton, Alberta. In 2013 this client asked us to perform spot roof repairs with liquid rubber to the lower metal roof. The next year (in 2014) they had us back to do spot repairs to the larger upper metal roof at their plant and to coat the complete lower roof included an internal hidden gutter. To this point we haven't had a call-back for any leaks and the customer is very satisfied with the result. August 22, 2014: Roof Coating Crew Arrives First Day For Work.  Site Location: 5604 59 Street NW Edmonton, Alberta. We accomplished getting all the units except for one and all the penetrations waterproofed on the upper shop roof with liquid rubber and mesh and/or seam tape (which was 18 units and about 50 penetrations). All units where meshed and sealed with liquid rubber. Tomorrow we will get all the metal roof seams waterproofed (which is about 2100 lineal feet) and we probably won't start the office roof coating until late tomorrow.
Roof Coating Edmonton, Alberta. Liquid Rubber. Metal Roof. Industrial.
Roof Coating Edmonton, Alberta. Liquid Rubber. Metal Roof. Industrial. Before photo.
Metal Roof - Roof Coating Edmonton, Alberta.
Metal Roof - Roof Coating Edmonton, Alberta.
Old Patch Work to roof that cracked and peeled (asphalt product).
Old Patch Work to roof that cracked and peeled (asphalt product).
Full Roof photo of lower office roof. Liquid rubber prep started at seam.
Full Roof photo of lower office roof. Liquid rubber prep started at seam.
Crew Member Starting Liquid Rubber Meshing Around Unit
Crew Member Starting Liquid Rubber Meshing Around Unit
  August 24, 2014: Crew Arrives Back On Site.  Today the crew got almost all the seams on the upper shop roof all sealed in with liquid rubber, and the bad ones with mesh and liquid rubber. I have about 150 feet left to finish in the morning and then we will be starting the coating on the lower office roof.
Mesh Before Liquid Rubber
Mesh Before Liquid Rubber
Liquid Rubber
Liquid Rubber
Liquid Rubber Around Penitration
Liquid Rubber Around Penetration
Liquid Rubber Seam
Liquid Rubber Seam
  August 25, 2014: Crew Arrives Back On Site. Today we finished all the units and penetrations on the office roof. We also got half the roof rolled (coated). We are on schedule for site completion tomorrow.
Liquid Rubber Half The Roof Completed
Liquid Rubber Half The Roof Completed
Liquid Rubber To Metal
Liquid Rubber To Metal
Liquid Rubber Coating To Half The Roof
Liquid Rubber Coating To Half The Roof
Liquid Rubber Coating
Liquid Rubber Coating
  August 26, 2014: Crew Arrives On Site And Completes Job.  Today we were down a guy, but we managed to finish the lower shop roof coating completely. When job was finished I did a site walk through with the customer and he was very happy with the work.
Liquid Rubber Coating Completed
Liquid Rubber Coating Completed
Liquid Rubber Coating In Edmonton
Liquid Rubber Coating In Edmonton
Liquid Rubber To Commercial Building
Liquid Rubber To Industrial Building Lower Roof
Liquid Rubber Coating
Liquid Rubber Coating
  < End of Report >   CONTACT US Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Edmonton Commercial Flat Roof Repair, June 15, 2015

Article: Commercial Tar and Gravel Flat Roof Repair Edmonton.

Below is a brief roof site report from our Edmonton roofing repair crew. It is a commercial roof with a tar and gravel roof that has aged and dried. The layers of bitumen have dried and contraction is causing the layers to pull away from the wall. Tar and gravel roofing is one of a number of flat roofing systems available. Tar and gravel is one of the original systems. Torch on modified bituminous membranes then came out (manufactured in rolls), then single ply systems such as EPDM, TPO and PVC and fluid applied membranes. The advantage tar and gravel or built-up roofing (BUR) has is that if it is maintained regularly by a professional it can last almost forever. The disadvantage tar and gravel roofs have is the cost to replace. Tar and gravel roofing requires significant labour and as such is more expensive to replace than most roof systems. Below you will find a tar and gravel roof experiencing age related repair issues. Over time, as UV breaks down the bitumen and dries out the roof it will begin to contract and pull away from the edges. A common repair with tar and gravel roofing is at the roof edge. August 19, 2014: Crew Arrives On-Site To Complete Hourly Repairs.  We met with the client to inspect the leaks and the roof. When I got up on the roof I noticed that the client had tried to fix the leaks himself using tar, and lots of it. But where he put the tar was not the source of the leak, the leak was along the wall under the metal and the 4 ply of paper was split from the old BUR roof. It was split about 20 feet along the cant metal on both ends of the building. We performed a temporary repair to the roof using sopramastic and mesh. This should fix the problem of the leaks.
Tar And Gravel Repair Completed - Edmonton Flat Roof Repair.
Using mastic and mesh, we sealed in the actual source of the leaks. Water had been coming in along the wall under the metal. As well, the 4 ply paper had been split away from the old BUR roof.
Tar And Gravel Repair along roof parapet.
Roof parapet repaired using mastic and mesh.
Mastic Under Metal
Some of the flashing had buckled away from the parapet wall. We applied some mesh and mastic underneath this area and then secured the metal back into place.
Leak area of flat roof along cant flashing at wall.
Leak area of flat roof along the cant flashing at the parapet wall.
Flat Roof Tar And Gravel Repairs
We followed the same process as before, applying mastic and mesh along the perimeter of the cant flashing.
Visit our main website for Edmonton Flat Roofing Repair services. < End of Report > CONTACT US Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Commercial Metal Roof Repair Edmonton, June 15, 2015

Article: Liquid Rubber Coating Spot Repair to Commercial Metal Roof.

The report below is a metal roof inspection with recommendations and temporary repair and maintenance of a commercial standing seam metal roof in Edmonton, Alberta. The Product used for the repairs was liquid rubber. Commercial metal roofing systems require constant maintenance and repair to keep them from leaks. Depending on the slope (the higher the slope, the less leaks usually), the type of metal seams, age of roof and the initial installation quality your roof may need more or less repair or maintenance. For aggressive repair and maintenance of a commercial metal roof we would recommend a complete coating. For roofs that aren't leaking too badly we can do spot repairs. Sometimes roof penetrations can be replaced properly or even the fasteners can be replaced to stop leaking. There are different maintenance steps we can take dependent on the specific challenges. As far as the type of caulking or coatings we recommend... liquid rubber in Canada has been an excellent product for us and our clients. There are many products available on the market from the USA, but in most instances they peel and crack and do not last very long due to the harsh winters in Canada. The combination of a proper seam tape and liquid rubber will usually deal with any metal roof leaks you have. Visit the following link for scope of work used for various liquid rubber metal roof repair and maintenance.   July 29, 2014: Roofing Crew Arrives For Metal Roof Inspection. They are getting leaks from units on the roof as well as three big hood vents coming through the wall. The caulking has let go and would need be removed and resealed plus mesh the sides of them. There are 6 units and 10 penetrations on the roof - they would like them all sealed with mesh and liquid rubber. We would be looking at 40 to 50 man hours to complete job.
Leaking Around Rooftop Unit Curb
There had been leaking around a rooftop unit curb, caused by residual standing water draining towards the unit.
Leak Identified at wall cladding where it meets low slope metal roof.
Leak identified at the wall cladding where it meets the low slope metal roof.
Leak Around Unit
Another rooftop unit adjacent to the edge of the roof whose detailing was identified as being a leak entry point.
Metal Roof Leaking - Commercial Roof Repair Edmonton. Metal.
Inspecting for common leak points at the wall connections and around the remaining units.
  August 6, 2014: Crew Arrives To Complete Repairs.  Today we had to remove old roof caulking from the hood vents and also around some spots around the units after we did that. We cleaned them and applied seam tape and then applied our liquid rubber. We applied two coats of liquid rubber to all. As for the hood vents, we removed all old silicone and applied new caulking and sealed in the sides with seam tape and liquid rubber. I also sealed in the caulking with liquid rubber for extra protection for all rooftop units, vents and penetrations. The roof leak issues are sealed 100% and site is 100% complete. Material used. 1.5 pails of brush grade liquid rubber. 3 rolls of seam tape. 5 tubes of chalking.
Liquid Rubber Around Vent
Liquid coatings around the base of a plumbing vent and over some exposed flashing seams.
Liquid Rubber Repair at wall cladding area.
Coatings applied over a wall cladding area around a vent. 
Liquid Rubber Penetration Repair
Our coatings also extend around all roofing penetrations and standing seams which exhibit signs of deficiency (i.e. exposed, tearing, etc.).
< End of Report > Contact Us Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. For all other areas of Canada call us at 1.877.497.3528 toll-free. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

EPDM Flat Roof Replacement Edmonton, June 12, 2015

Article: EPDM Flat Roof Replacement. Residential Low Slope Project.

Below is a site report detailing the installation of an EPDM flat roof replacement in Edmonton, Alberta. The roof was originally a built-up tar and gravel low slope roof that connected to a shingle pitched roof system. Considerations with respect to flat roof systems. When considering flat roof replacement options, it is best to consult experts prior to choosing which membrane you will use, what will make up the roof system, and how the roof assembly will be put together. There are many considerations such as slope of roof, drainage scuppers and internal drains, insulation value, which membranes work best in your climate, what will the effect be on the building efficiency, and much more. All decisions are vital to immediate and long-term success. A flat roof is a considerable expense so you want to be very cautious to make the right decisions.
Visit our main website for a complete guide to selecting flat roofing replacement systems.
May 9, 2013: Crew Arrives For Assessment. Flat Roof Inspection.  This is a tar and gravel flat roof that connects to a steep pitch shingle roof. The roof is leaking and has been for some time in different areas. The roof is soft and spongy and there will be some replacement of sheathing and possibly the insulation. The roof is 960 square feet and needs to be re-sloped. The old roof would have to be removed to add enough room for re-sloping.
Tar And Gravel Roof. Flat Roof Replacement Edmonton - EPDM.
Tearing in the roof membrane visible under the ballast rocks. The roof had become soft and spongy, with leaking in different areas all throughout.
Drain Needing Replacement on this roof.
Drain needing replacement on this roof.
Flat Roof image with chimney detail in photo.
Inspecting the chimney detail and previous spot repairs, surmising whether new metal components would need to be ordered for the replacement.
Existing Tar And Gravel Roof Before EPDM Install.
Pre-replacement photo of various appliances, such as the skylights and plumbing boots.
May 10, 2013: Flat Roof Replacement Quotation is Provided.  Our standard flat roof pricing, quotation formats and inspection reports are extensive to ensure you're equipped to ask the right questions when obtaining prices from other roofing contractors. Our quotes include all flat roof system membranes and methods of installations. Our inter-provincial journeymen red seal roofers are experts in each area of install.
Quotation
Quotation for flat roof replacement (page one only).
June 30, 2013: Crew Attends Site for Replacement of Flat Roof.
Re-Sloping Flat Roof to drain water properly.
The roof boards were mechanically fastened to the roof in such a way to achieve the correct pitch. Re-sloping ensures that a flat roof drains water properly.
Flat Roof Replacement - Roof board mechanically fastened with screws and plates.
Roof boards mechanically fastened with screws and plates around the skylights.
EPDM installation starting.
Beginning the EPDM installation around the roof edges.
July 2, 2013: Crew Finishes EPDM Roof Replacement.  EPDM Roof Is Complete.
Roof Completed With EPDM
Completed EPDM installation, with liquid rubber coatings applied around the base of the plumbing boot.
Flat Roof Replacement
Wide view of the flat section of the roof post-EPDM installation. All that remained was completing the detail work.
Flat Roof Replacement With EPDM
New drain installed on a narrow section of the flat roof, with liquid rubber coatings applied over the seams.
EPDM with new drain.
EPDM with new drain installed; seam patches visible in the background.
EPDM Flat Roof
To complete the site, we finished the detail work using seam patches and liquid rubber coatings.
< End Report > Contact Us Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. For All Other Areas of Canada Call us Toll-Free +1.877.497.3528. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Temporary Flat Roof Repair Edmonton, June 15, 2015

Article: Temporary Flat Roof Repair. 2 Ply SBS Modified Bitumen Torch-On Roof.

Below is a short roof report that shows temporary emergency roof repairs using mastic to a flat roof in Edmonton, Alberta on a 2-Ply Mod Bit Torch-On System. Normally when we attend to flat roof repairs, the goal is to either perform repairs that have a high probability of lasting for some time or replace the roof. In some instances, our customers do not have it in the budget to either do the repairs properly or replace the roof. Often they have a replacement budgeted for the future. In the instance below the customer wanted the least expensive option to simply stop the leaks until he/she could finance a roof replacement. A quote for much more extensive repairs was provided but declined. January 20, 2015: Crew Arrives On-Site To Complete Repairs.  Originally the client had one leak on a goose neck vent. After further investigation it seams that another has started in a dryer vent. The crew fixed both the leaks with sopramastic and mesh. The customer looked at our work and was very happy with what was done. Man hours: 3 total. Materials:
  • 1 gal can of mastic.
  • 8 ft. of 6 inch mesh.
2 Ply SBS Roof Repair Edmonton
The client was experiencing leaks due to melting snow entering the building through various rooftop appliances.
Flat Roof Vent Repair
Ideally, a flat roof with this much ponding should be replaced. 
2 Ply SBS Mastic Repair
2-Ply SBS mastic being applied around the base of a ventilation unit.
Flat Roof Repair
Mastic repair around a post.
Mastic Repair
Mastic application in-progress around another ventilation unit, sealing in any cracks or exposed seams surrounding it..
Visit the following for more information on mastic roof repairs. < End of Report > CONTACT US Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. For all other areas of Canada call +1.877.497.3528 Toll-Free. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Flat Roof Repair Edmonton – Gum Box. June 10, 2015.

Article: 2 Ply SBS Torch-On Low Slope Roof "Gum Box" Repair on Commercial Roof in Edmonton Alberta.

"Plastic pan - also called pitch pan, pitch pocket, gum box, these comprise a flanged collar placed around items that project through the roof system; the flange is properly set into the roof membrane and the pan is well filled with plastic cement; these pans are a constant source of trouble and should only be used when no other solution can be found." Source: Red Seal Roofer Program Website. February 13, 2015: Journeyman Roofer Attends for Roof Inspection.  Address 11754 170 Street Edmonton, Alberta.
The client is experiencing a small leak 15 feet in front of the front doors around an electrical conduit penetration in the roof.
The electrical conduit is two feet from the roof edge which is the highest point on the roof as the drains are in the center. I believe the leak could be leaking around the gum box which is starting to crack or where the stack is fastened to the roof. I believe the water is getting in through those holes and running back into the system.
To fix this problem we would need to first put a gum patch on the gum box and tighten up the bolts on the bracket that holds the conduit and seal around it with some good caulking.
Man hours 3 - 6 total with drive time and inspection time. Material 1 - 3 gal pail of gum. 2 tubes of tremco chalking.
Roof measurements 130 ft x 160 ft with two drain and 13 penetrations. The roof is approximately 10 years old and in good shape.
2 Ply SBS Roof
2 Ply SBS Commercial Roof in Edmonton, Alberta.
SBS Leak Area. Flat Roof Repair Edmonton - Gum Box.
SBS Leak Area. Flat Roof Repair Edmonton - Gum Box.
2 Ply SBS Leak
2 Ply SBS Leak Area.
SBS Roof Repair
SBS Roof Repair
2 Ply SBS Leak Identified
2 Ply SBS Leak Identified
  February 21, 2015: Crew Arrives On Site To Complete Repairs. This morning we stopped by to confirm were the problem area was and that we had everything for the job.
Once we got back to site and went up to the roof I could tell that the water was coming in from the gum box.  A couple of things caused the failure, first that the steel pipe had moved slightly from being pulled by the weight of the wire hanging and that the crew that installed the roof only filled the gum box up 1/4 of the top with gum and had 3 inches of bat insulation filler.  Over time the gum began to dry and crack and settle allowing water to pond inside the gum box and leak through.
So we removed the gum out of the gum box and some of the insulation and filled 3/4 of the gum box with pour-able sealer, a permanent repair for the problem.  As a precaution, we also added a bead of lap sealant around the base of the gum box so that no water could pond there and installed a bead of high quality caulking around the metal support which had bolts going right through the parapet wall with no sealer.
Materials used: I tube of tremco caulking. 1 tube of lap sealant. 1 package of pour-able sealer.
Gum Box Repair
Gum Box Repair
2 Ply SBS Leak Repair
2 Ply SBS Leak Repair
2 Ply SBS Torch On Roof Repair
2 Ply SBS Torch On Roof Repair
Repair
Repair to gum box.
  < End of Report >   CONTACT US Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.

Residential Flat Roof Repair Edmonton, June 9 2015

Article: Residential Flat Roof Repair Edmonton, Alberta. EPDM Low Slope Roof Membrane.

Repair of an EPDM low slope roof on a residential home in Edmonton, Alberta. The low slope (flat) roof transitions to a pitched shingle roof. Penetrations and challenges include chimney, skylights, vents, drainage, ice damming, and insulating value on low slope. Additionally the transition between the low and steep roof systems posed challenges. Also a section on choosing the correct low slope membrane and roof assembly.
This customer had originally called us when Edmonton had set records for snow-fall in January of 2012. She had significant snow loads on her roof and the concern was that her roof may collapse. So we removed the snow from her roof and discovered significant ice damming challenges on the low slope portion.
We returned in 2013 and 2014 to do regular roof snow removal because every-time the snow built up on the roof the heat from inside her home would get to the underside of the low slope roof sheathing and cause ice damming. The ice dams would then get in between the laps of the existing roof membrane and result in leaks.
Mid 2014 she contacted us to quote on the replacement of the low slope roofing with hopes of solving the problem.
We quoted the various options for low slope roofing membranes, which included; Spray Foam (SPF), Tar and Gravel, SBS Torch-On, EPDM, TPO, PVC and Liquid Rubber.
Our standard quotations include pricing for the different options available for flat roof system membranes, a roof inspection report, a write-up on the pro's and con's of each type of system and our recommendations for your most suitable roof membrane choices.
Below is a sample flat roof quotation. The first link is a PDF download and the second is a Word Doc file download.
Our customer chose to replace her failing tar and gravel built up roof with an EPDM single ply membrane roof recovery (or retro-fit). This means that we removed the gravel and skinned the bitumen membrane off and then mechanically fastened a roof board and then fully adhered the EPDM. We also did some drain work and scupper work. Our customer did not opt for a complete removal, re-sloping with an engineered slope insulation system, or any additional R value added which could also have been done with simple rigid type insulation boards.
In early 2015 our customer had called with leaks to the low slope membrane - the ice dams were back. This is an important lesson in choosing the correct roof membrane, insulation, drainage, re-sloping and more. Had we been able to re-slope the roof and been able to add insulation value, the heat from the inside of the home would not escape and get to the underside of the roof membrane and cause ice damming. But, the customer requested the least expensive options and even though our reports (see link above for sample quotation and inspection report) explain in detail most considerations, this is the way it was requested to be done by the customer.
So this spring we returned to find the same ice damming causing issues with a now new membrane. We also found drainage issues which were expected - the roof was ponding because a re-slope was not in our scope. And there were some technical (debatable) installation tweaks that may or may not have been required. Nonetheless, we now had a new roof leaking the year after it was installed.
So of course we once again suggested the upgrade options to alleviate the issue but the customer would have nothing with that and requested we simply do the repairs and move on.
Below is an account from the crew of the type of repairs they did to try and mitigate any issues in the future (full well knowing that the prime aggravating factors are insulation value and sloping).
May 5, 2015: Crew Attends to Residential Flat Roof Repair.  We arrived on site at 9:58. We started the day with the toolbox meeting and safety documents. We then went up on roof to determine an installation plan. The scope of work we decided on and did is as follows.
Scope of Work # 1 The first step was to pull all EPDM down to flat roof from under the shingles at the bottom of the sloped roof. This reinstall was to ensure no water could be coming from the flat roof to steep pitch roof transition. We then had to remove all metal flashing from around the two skylights and chimney on the roof. Once we had all the EPDM pulled we started lifting shingles along the first few rows of the sloped roof and applied the EPDM bonding adhesive. This was done under the first couple layers of shingles and to the underside of the EPDM. We then installed the EPDM back under the shingles. Then next step was to apply a bead of water block on the edge of the EPDM under the shingles. Once that was complete we secured EPDM by screwing a piece of turn-bar down on the edge of the EPDM where the water block bead was applied.
Scope of Work # 2 The crew arrived on site at 1 pm and started working on the cricket behind the chimney.  He started by cutting a piece of EPDM 7'x3'. He then had to take the Epdm bonding adhesive and apply in the same manner as the work in scope # 1 by applying the adhesive under the shingles as well as the under side of the Epdm. Once the 7'x3' piece was installed he started working on the corners. Using quick prime and seam tape he seamed in the corners of the Epdm around the chimney.
 
WORK LEFT TO DO: -patch corners -more turn bar and water block -install and or replace shingles Roughly 6 hours of work left to complete.
MATERIALS USED: -7'x3' piece of EPDM -EPDM bonding adhesive 1/3 of a pail -screws -30 ' of termination bar - 2 tubes of water block -tube of caulking for skylights -half a tube of lap sealer for temporary seals -6 feet of seam tape - quick prime 1/8th of a pail.
Residential Flat Roof Repair Edmonton. Pulling EPDM out from under shingles.
Residential Flat Roof Repair Edmonton. Pulling EPDM out from under shingles.
Peeling back Epdm membrane from skylight curbs.
Peeling back Epdm membrane from skylight curbs.
Taking flashing off chimney
Taking flashing off chimney.
Applied EPDM Adhesive
Applied EPDM Adhesive.
Rolling EPDM back under shingles after adhesive was applied.
Rolling EPDM back under shingles after adhesive was applied.
Installed Piece of Termination bar on tup edge of EPDM (under shingles)
Installed Piece of Termination bar on top edge of EPDM (under shingles).
joining two seams of EPDM, with quick prime and seam tape
Joining two seams of EPDM, with quick prime and seam tape.
May 8, 2015: Residential Flat Roof Repair Crew Attends.
We started at 7:30 AM with a daily tool box meeting. We then got up on the roof and started shoveling snow away from work area so we could complete today's scope of work.
Scope #1. Scope one consisted of applying corner patches to the rear corners of the chimney. The next step was to apply tape primer to the EPDM surface on the corner of the chimney. We then cut 6"×6" squares of 6" covers strip  to use at the corner patch.  We applied  this piece on top of the tape primer and let it sit to cure.
Scope #2. Install termination bar for the EPDM on the front of the skylights. For this we measured and cut a piece of turn bar to fit the front side of the sky light. We then screwed (mechanically fastened) the termination bar.
Scope #3. We had to take the bottom two layers of shingles off and replace with new ones. For this we had to carefully lift the bottom rows of shingles and pry out the nails so the shingles would slide out. We then took the new shingles and installed them. This consisted of laying down the first layer and nailing in place. The next step was to put on the second row of shingles which slid under the old existing one and nailed in place half way down the first shingle we layer down. Job is complete.
Completion photo #1 of where shingles at steep pitch meet low slope EPDM membrane.
Completion photo #1 of where shingles at steep pitch meet low slope EPDM membrane.
completion photo #2
Completion photo #2.
Materials Used:
-2 bundles of shingles
-roofing nails
-8'of turn bar
-2' of cover strip
-rags
- tape primer
-screws

< End of report >

Click here to visit our local roof repair website and order a quotation for flat roof repair in Edmonton or area or contact us per below.

CONTACT US
Call our 24 Hour Emergency Roof Repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5.
For all other areas of Canada call 1.877.497.3528 Toll Free.
We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.
  Code: 10007

EPDM Roof Replacement Edmonton, June 8 2015

ARTICLE: EPDM Roof Replacement Edmonton, Alberta. Flat Roof, Residential, Single-Ply Membrane. Firestone.

A roof site report documenting the installation of a small flat roof on a residential property. We replaced the roof with EPDM membrane in Edmonton, Alberta. The old roof was a roll on built up roof. About EPDM Roofing. Ethylene Propylene Diene Monomer (EPDM) roofing is now one of the more used roof systems in North America. EPDM roofing is a single-ply roof membrane like TPO and PVC. The single-ply membranes came along more than forty years ago after tar and gravel and SBS modified torch-on. The most popular single-ply roof membrane systems in Canada are EPDM (rubber roofing), TPO (thermal plastic) and PVC (poly-vinyl). Single-ply membranes are more affordable than tradition BUR and torch on roofing systems due primarily to labor savings. Single ply roof material is also less costly, but the main savings comes as a result of installation time being less. In warmer climates, white or reflective roofs produce a net benefit for building efficiency. In colder climates (like Alberta), a black membrane such as EPDM produces a net benefit because we have more cold days than warm days. EPDM can assist with snow melt being faster and this improves overall building performance and efficiency by lessening the roof dead weight load. A dark roof will also melt ice dams quicker resulting in less maintenance due to membrane damage caused by ice and snow. EPDM also has the benefit of thermal shock durability. The EPDM roofing association states that EPDM has expansion of 300 percent. When you add the UV stability EPDM possesses to its expansion qualities it makes sense to use it in any environment. Traditional BUR and torch on SBS do not have the same expansion quality or UV stability. Tar and gravel requires pea gravel and SBS requires granules to protect it from the sun’s rays. Even TPO and PVC do not have the expansion qualities of EPDM. A significant benefit of using EPDM is that science tells us in many recent studies that in a cold climate single ply reflective roofs are prone to condensation issues – EPDM is black and doesn’t pose that issue. EPDM can last more than 40 years because of its high resistance to ultraviolet (UV) radiation according to the EPDM Roofing Association (ERA). EPDM’s resistance to moisture absorption allows it to be installed on roof systems with less of a slope than other single-plies. EPDM is also used for waterproofing reservoirs, geo-membranes, ponds and has many other uses. Choosing the Right Membrane for You. When choosing a low slope roof membrane we suggest examining the various options available on the market. Many contractors only install one or two options and are therefore not your unbiased source. Obtaining quotes from contractors that represent all system choices will help you determine which system is right for your building considering budget, performance, warranty, climate, efficiency and many more considerations. We see it all the time (the wrong choice) because we are roof repair experts - we process thousands of incoming inquiries every  year. We have seen people purchase EPDM when their roof was a high traffic area, which is not the correct membrane. We have seen large sophisticated operations in northern or central Alberta and Saskatchewan opt for a reflective membrane citing their green initiatives, which is not usually going to produce a net benefit and if you study it out will likely not hit the end goal target relating to green objectives. We have even had building operators in areas as far north as Dawson Creek or Rainbow Lake ask for a spray foam (spf) roof with a reflective covering such as polyurea on a metal roof system because their goal was to achieve waterproofing. Spray foam (spf) roofing of course will insulate but it doesn't assist in waterproofing and a reflective roof in a cold climate works against building efficiency. If you want waterproofing on a metal roof use liquid rubber in a cold climate. If you want R value then spray foam is a great option. But why pay for the insulation if you don't need it? There are many more examples. It is very important when choosing a low slope roof membrane to consult the sources and be sure it is the right system for your location and goals. Below is a report from Edmonton, Alberta that has a homeowner choosing EPDM because they wanted a better net benefit than white or cool roofing could offer. They chose a complete replacement vs. a roof recovery (retro-fit) because the existing roof assembly was not sound and there was existing moisture in the old built up roof. They did not require more R value so there was no added spray foam (SPF) or roof insulation boards to the roof. For more information on EPDM roofing visit this article from Construction Canada. http://www.constructioncanada.net/the-single-ply-skinny-on-epdm/ May 23, 2015 - Day one. Crew attends for EPDM roof replacement. 
7:30 am we started our day by going to pick up all materials needed to complete this roof . 9:30 am arrive on site . We did our daily tool box meeting for safety and then went up on the roof and started to tear up the old roof. This was not easy as there were three different roof systems on top of each other. This took 4 hours to do. Once it was fully tore up I started to replace the rotten areas with new sheathing, which wasn't much. We also had to install sheathing on the back portion of the roof.  To install the sheathing we used nails and nailed down the sheathing to the roof framing where it needed to be changed out.
Condition of the substrate on the old roof.
Condition of the substrate on the old roof.
EPDM Roof Replacement Edmonton. Old Built Up Roof before replacement.
EPDM Roof Replacement Edmonton. Old Built Up Roof before replacement.
Ripping up old roof
Ripping up old built up flat roof.
 cleaning up debris after ripping up roof
Cleaning up debris after ripping up roof.
 

May 24, 2015 - Day two on site.

8 am we arrived on site and had our daily tool box meeting. We then went on the roof and started sheathing in the entire roof. Once I got the guys installing plywood on other side of roof we went to install the EPDM on the back portion of the roof. Once that was complete we helped finish the sheathing along the parapet walls.

Once the roof was fully sheathed we then started to lay rubber on our open field. We managed to get most of it done, but we will have to return for 5 hours tomorrow to finish the roof.

Installing Sheathing on roof
Installing sheathing on roof.
Parapet wall construction for EPDM roof.
Parapet wall construction for EPDM roof.

May 25, 2015: DAY 3 completion.

We started the day with our daily tool box meeting. We went up on the roof and we started finishing the EPDM on field of the roof. We then started on the parapet walls.

When one side of the parapet wall was complete we then started on the other side of the parapet walls. When the parapet walls were done we then started to seal in the drain with form flash and install all the seam patches and corner patches also with form flash.

Once that was finished I helped the guys finish the other parapet wall. The crew then cleaned up the roof and the ground while I sealed in the other drain and corners with form flash. When the roof was complete I then put lap seal in the corners with patches and all three laps. The home owner did a quick inspection when we where finished and was extremely happy with the work.

Finished EPDM ROOF
Finished EPDM Roof.
EPDM roof installation Edmonton, Alberta.
EPDM roof installation Edmonton, Alberta.
EPDM roof membrane installed.
EPDM roof membrane installed.

The rest of the following photos are all finish product photos of the new EPDM Flat Roof.

Materials Used: EPDM. 3 cans of bonding adhesive. 1 can of quick prime. 1 can of lap adhesive. 2 rolls of 3 inch seam tape. 1 roll of form flash. 30 sheets of plywood. 1 box of nails 100. 1 box of 2 inch wood screws 500. 2 tubes of lap sealant. 10 pieces of drip edge.

CONTACT US
Call our 24 Hour Emergency Roof Repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5.
For all other areas of Canada call 1.877.497.3528 Toll Free.
We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.
    Code: 9311

Roof Deck Drainage and Waterproofing

ARTICLE:  Roof Deck Drainage Problems. Waterproofing a 2 Ply SBS Modified Bitumen Roof Balcony in Edmonton, Alberta.

Recommendations for Waterproofing Outdoor Decks Over Conditioned Living Space. Roof Deck Drainage and Waterproofing - Inspection and Repair of a Torch-On Flat Roof on Outdoor Balcony at Multi-Family Condominium. Customers regularly call on us to have roof assessments (inspections) completed. During a roof assessment our journeyman roofers assess the roofs condition. We assess the roof for preventative maintenance reasons as well as inspecting existing problems that the customer is pointing out. We then discuss different scopes of work fix the problems as well as potential materials and costs related to the repairs. One of the most common calls we get for inspections and repairs are rooftop decks, balconies and patios. The primary reason the failure rate on rooftop decks is so high is because of the original installation. It is common for incorrect membrane choice to be the reason. In other words, many people install an outdoor deck membrane that is intended only for an outdoor deck and not a membrane for over a heated living space. If your rooftop deck or balcony is over a heated living area you require a special membrane that is also intended for low slope roofing (as well as deck waterproofing) and is approved for use over a conditioned living space. Common products for this are Dura-Deck or DecTec, both of which are a PVC membrane that are suitable to be walked on (so they do not require a floating deck over top) and they manufacture membranes suitable for over a conditioned living space. We use DecTec extensively and have had great results with it. Or, also common is the installation of a membrane that won't hold up to the foot traffic associated with outdoor living areas. Other reasons include simple age, wear and tear, drainage and issues relating to penetrations or floating deck assemblies on top of the membrane. Visit our main website for more information on rooftop deck waterproofing. This particular inspection and subsequent repairs was more focused toward an aging membrane and the associated repairs that come with not properly maintaining the deck membrane and building envelope over the years. The drainage problems were causing significant damage to the exterior of the building. Below you will find the inspection report. May 20, 2015: Journeyman Superintendent Attends for Balcony Inspection. Roof Inspection Location: 10245 116 Street NW Edmonton Alberta. Roof Inspection Date: May 20, 2015. Roof Type: SBS 2 Ply Modified Bitumen Torch-On Membrane on Roof Balcony. Site Location Type: Multi-Family Condominium.

This customer is experiencing a problem with water getting in the roof system and it draining out on a low corner and destroying some exterior brick work. In the area of the leak there are 2 laps of the SBS modified bitumen that have come apart.

Roof Deck Drainage damaging exterior of building. Edmonton, Alberta.
Roof Deck Drainage damaging exterior of building.
SBS Torch ON Seam Pealing back
SBS Torch-On lap pealing back.
SBS Torch on roof, seconf lap starting to come apart
SBS Torch on roof, second lap starting to come apart.
 

Scope: To repair this, degranulate the area and apply new torch-on stripping in and around the corner to seal in properly. Man hours: To complete 3 - 6. Material needed: 1 roll of SBS modified cap membrane.

The customer  would also like a quote for the following scope: to fill 13 pitch pockets on the roof and also seal the voids around pitch pockets with some detail sealer.

Area that needs sealing
Area that needs sealing at gutter to wall area.
Pitch Pockets that need filling
Pitch pockets at deck railing post termination area that need filling.
More seams on the sbs torch on roof that need to be sealed
More seams on the SBS torch-on roof that need to be sealed.

Man hours to complete = 10. Material needed: 4 gallons of portable sealer. 1 box of IKO MS Detail.

More Reading:
http://www.jlconline.com/decks/waterproofing-a-rooftop-deck.aspx
https://www.grscanadainc.com/Rooftop_Deck_Waterproofing.html
https://www.grscanadainc.com/DecTec_Deck_Waterproofing.html
http://www.dec-tec.com/
https://www.pinterest.com/generalroofing/dectec-deck-and-rooftop-waterproofing/
File to be updated when repair reports come in to office.
< End of report >
CONTACT US
Call our 24 Hour Emergency Roof Repair at 1.780.424.7663 Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5.
For all other areas of Canada call 1.877.497.3528 Toll Free.
We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.