Nisku Liquid Rubber Roof Recovery, June 2014

Our project manager provided this client with an initial quotation for the liquid rubber roof recovery. This report follows the recovery process undertaken by the GRS crew. Roof Report, June 10, 2014:
Arrived on site and inspected the roof for materials needed as well as man hours needed to complete the work. Materials Required:
  • 6 pails of liquid rubber.
  • 1 pail of trowel grade.
  • 3 tubes of caulking.
  • 1 roll of reinforcement mesh.
20140610_101341_resized 20140610_101349_resized 20140610_101400_resized 20140610_101417_resized 20140610_101429_resized 20140610_101438_resized 20140610_101440_resized 20140610_101623_resized 20140610_101651_resized 20140610_101718_resized
Roof Report, June 12, 2014: Today we completed all of our trowel grade and the prep work which included patching holes, the center seam, and the corners. After that we started brushing in where the standing seams are. This was a long process and by the end of the day 90% of the liquid rubber prep was complete. 20140613_082918_resized 20140613_082922_resized 20140613_091148_resized 20140613_091151_resized 20140613_095655_resized 20140613_095659_resized 20140613_095704_resized 20140613_103003_resized 20140613_103007_resized 20140613_105347_resized 20140613_105350_resized 20140613_170437_resized 20140613_170451_resized 20140613_170459_resized 20140613_170521_resized 20140613_170528_resized Roof Report, June 14, 2014: Today we got the roof to about 85% completion. I will have to return on Monday for a couple of hours as it's a long process to complete the brush work around the standing seams. 20140614_171758_resized 20140614_171800_resized 20140614_171836_resized 20140614_171916_resized 20140614_171927_resized 20140614_172029_resized Roof Report, June 15, 2014: Arrived on site and the first thing we did was have our safety meeting. Then once on the roof we cleaned and started to do our prep work like patching and finishing all of the seams with mesh.
We finished our prep work and started to brush and roll in LR on the panels. Roof Report, June 16, 2014:
Today we finished the roof completely. It looks very good and the customer was extremely happy with the work. This site is now complete. Materials Used:
  • 8 pails of roll on.
  • 1 pail of trowel grade.
  • 10 paint brushes.
  • 10 paint rollers.
  • 1 roll of mesh.
20140616_122233_resized 20140616_122246_resized 20140616_122249_resized 20140616_122307_resized 20140616_122310_resized 20140616_122317_resized 20140616_122322_resized 20140616_122329_resized 20140616_122400_resized< End Report > CODE: 511 Contact Us Call our 24 hour emergency roof repair at 1.780.424.7663. Mail to: 3428 99 Street NW Edmonton, Alberta T6E-5X5. We service all of Alberta including Edmonton, Stony Plain, Spruce Grove, Fort Saskatchewan, St Albert, Sherwood Park, Leduc, Nisku, Beaumont, Lac La Biche, Grande Prairie, High Level, Westlock, Slave Lake, Edson, Drayton Valley, Devon, Camrose, Wetaskiwin, Tofield, Lamont, Morinville, Vegreville, Tofield, Millet, Calmar, Evansburg, Redwater, Onaway, Viking, Athabasca, High Prairie, Valleyview, Fairview, Peace River, Whitecourt, Mayerthorpe and many more rural areas and towns.